Wednesday, October 3, 2012

Sub Floor Repair

  
A few photos from the repair work to strengthen our squeaky floor. 
First we sister-ed every other floor joist with steel joists (had to overlap 2 to make the full span) then we put back the dead men between the joists and finally glued & screwed on the plywood sub floor. There's still another layer of plywood to go down to raise it to the right level to match the rest of the house.




No comments:

Post a Comment

LinkWithin

Related Posts Plugin for WordPress, Blogger...