Monday, March 18, 2013
Inexperienced Tilers at Work
After weeks and weeks of delays due to missed appointments and scheduling conflicts our contractor finally came a week ago and installed the backerboard for the backsplash. He brought us thinset & trowels, but left us on our own to install the glass tile backsplash. He was very uneasy about cutting glass tile. We are using 6"x12" tile, so they are a bit large. My husband took a few days off work and we've spent 4 days working so far and have only finished the first wall.
First we needed to put in some aluminum edging to cover the backerboard where the tile ends because we didn't find any matching bullnose for our glass tile. The first strip we cut by hand with a hacksaw. Since we no longer had the miter saw, or a hand miter box, my husband thought we could use the tile saw to cut it. We have a portable wet saw (picked it up at a yard sale for $20) and a diamond blade for cutting the glass tile. But hubby wanted one with a sliding tray because he was concerned about scratching the colored backing that comes on the glass tile. So we went out and rented a tile saw and tried cutting the metal trim. That didn't work too well, the metal heated up from the blade & left an edge at the cut. So we had to go back to hand cutting with the hacksaw & trying to make clean 45 degree cuts. Ended up taking the rest of the day to install the trim & get the skim coat of thinset on the backer board.
Next day, we needed to figure out the best placement of the tile under the windowsill and around the electrical outlets so that we would have the simplest cuts possible. Laying them out was also a bit difficult with two faucets at the sink sticking up in the way. After a bit of debating, we finally settled on the placement and went to make our first cut. Well the blade on the rented tile saw chipped up the edge of the glass all along the cut. We should have tested it the day before... come to think of it, we did with a sample tile of a different brand & it looked OK, but our first cut was unacceptable. So we gave it a try on our wet saw with the diamond blade and it was a nice clean cut. Of course, at that point we looked at the clock & it was passed closing time on saturday for the rental place. So we'd wasted 2 days rental on a saw we didn't use. Lucky for us, when we did return it, the owner was very generous & only charged us for one days rent. Anyway, since neither of us have much experience with tiling, we decided to start with just the small batch of tiles centered under the windowsill first. After we got those cut, thinset mixed, notched troweled on the wall & buttered on the back we mounted our first tiles. Those little tile spacers are a pain, they keep falling out, especially when you try and sponge the thinset off the face of the tiles and out of the grout joints. When we finally finished that, it was getting too dark so the next morning we cut the ones to the left of the window. We laid them out like subway tiles but in a vertical direction, so each column had 1 full tile and a bit less than 1/2 a tile. The hardest cut was the 'U' shaped cut out for the outlet. Since the glass is so easy to crack & chip, the best recommendation we found was to cut parallel strips to the bottom of the 'U' and then break out the pieces. The first time we didn't get the 'U' quite deep enough. I suggested using the tile bit on the dremel to cut it a little wider. Unfortunately the dremel slipped and the bit scratched the front of the tile. Then I suggested that he try to just bring the tile down over the saw blade at the bottom of the 'U' not necessarily cutting all the way through the tile but to help break away the strips. I think he misunderstood what I was getting at - he tried the cut on another tile, but didn't cut the sides of the 'U' first and the tile cracked in two. Then on the third try, he cut the side lines first & then laid the bottom down over the spinning blade & it worked. The corners did chip out a little in the back (as the blade is curved) but the cover plate for the outlet is big enough to hide it.
So after we mounted those on the wall we got to repeat the same process for the other side of the window. But we didn't get the last section mounted until today, after returning the rented saw. The next problem was deciding how to space the tiles so we only had to cut one tile each for the 2 outlets on the next wall. I spent a few hours shifting them around so that we wouldn't have too thin a strip to cut on either end and by the time we settled on the proper spacing it was getting a bit late again, so now we have to squeeze in the rest of this tiling around our work schedules. The fun of DIY!
Monday, July 20, 2009
Renovation Existing Tile
When renovating a bathroom, most home improvement sites and books will recommend completely ripping out all the fixtures and tiles and updating everything. They say that you will usually recover the cost when you resell the house. That’s fine if you can actually afford the thousands of dollars in demolition and replacement. Many of us don’t have those resources. And with the current housing slump and home values having dropped dramatically, sinking thousands into a renovation may not pay off.
I have updated both the bathrooms in my home without replacing all of the tile. I have redone just portions of it. I did it myself, and it does involve some delicate precision and hard labor. I’m not sure tile contractors would like my approach either. Hiring someone to do this work may not be easy as they most likely feel it’s easier to tear it all out and then cover a clean flat wall.
Easy doesn’t always mean best for the environment. My approach is to preserve as much vintage tile as possible and to add as little as possible to the waste stream. Where does all that old tile end up? Probably a landfill. Maybe if it were being recycled for some other use, it wouldn’t bother me so much, but most of the time, you see large amounts of construction waste just packed up into dumpsters and trucked away.
Here’s what I did with the 1st renovation. We had broken tile on the windowsill, some edge tiles at the floor that were cracked, a broken ceramic wall mounted towel rack and worn out ceramic soap dish and toothbrush holders above the wall hung sink. After removing the sink, we also found holes through some tiles and cracks in others.
I loved the 50-year-old tan speckled tile but knew I probably wouldn’t be able to match it. The room had black edge tile, so I had to come up with a pattern to insert black tile to fill in the spaces where I removed the broken stuff. It required placing black tiles where the new towel bars would attach to the walls, black tiles on the new windowsill and a few rows of black behind the sink. It also involved preserving at least one tan tile to fill in a spot where one towel bar was removed. Getting tiles off in one piece is the trickiest part & mostly comes down to luck.
Here’s a few links on how to replace a broken tile…
http://www.thisoldhouse.com/toh/how-to/intro/0,,20051584,00.html
http://www.ehow.com/how_114958_replace-cracked-tile.html
perhaps I’ll post more about my own repair work at a later date as this is already getting too long winded.
I have updated both the bathrooms in my home without replacing all of the tile. I have redone just portions of it. I did it myself, and it does involve some delicate precision and hard labor. I’m not sure tile contractors would like my approach either. Hiring someone to do this work may not be easy as they most likely feel it’s easier to tear it all out and then cover a clean flat wall.
Easy doesn’t always mean best for the environment. My approach is to preserve as much vintage tile as possible and to add as little as possible to the waste stream. Where does all that old tile end up? Probably a landfill. Maybe if it were being recycled for some other use, it wouldn’t bother me so much, but most of the time, you see large amounts of construction waste just packed up into dumpsters and trucked away.
Here’s what I did with the 1st renovation. We had broken tile on the windowsill, some edge tiles at the floor that were cracked, a broken ceramic wall mounted towel rack and worn out ceramic soap dish and toothbrush holders above the wall hung sink. After removing the sink, we also found holes through some tiles and cracks in others.
I loved the 50-year-old tan speckled tile but knew I probably wouldn’t be able to match it. The room had black edge tile, so I had to come up with a pattern to insert black tile to fill in the spaces where I removed the broken stuff. It required placing black tiles where the new towel bars would attach to the walls, black tiles on the new windowsill and a few rows of black behind the sink. It also involved preserving at least one tan tile to fill in a spot where one towel bar was removed. Getting tiles off in one piece is the trickiest part & mostly comes down to luck.
Here’s a few links on how to replace a broken tile…
http://www.thisoldhouse.com/toh/how-to/intro/0,,20051584,00.html
http://www.ehow.com/how_114958_replace-cracked-tile.html
perhaps I’ll post more about my own repair work at a later date as this is already getting too long winded.